Report for consultant for April 1972.
By: Bangladesh Agricultural Developement Corporation.
Contributor(s): IDA Tubewells Project.
Material type:![materialTypeLabel](/opac-tmpl/lib/famfamfam/BK.png)
Item type | Current location | Collection | Call number | Copy number | Status | Date due | Barcode |
---|---|---|---|---|---|---|---|
![]() |
BIDS Library and Documentation Center | Non-fiction | BAN BADC IYP Rep. (Browse shelf) | C-01 | Available | 068501 |
Browsing BIDS Library and Documentation Center Shelves , Collection code: Non-fiction Close shelf browser
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
BAN BADC HYV HYV Task force reports. | BAN BADC HYV HYV Task force reports. | BAN BADC Ita Report on ITAP-79. | BAN BADC IYP Rep. Report for consultant for April 1972. | BAN BADC Mas. Masagana 99 : | BAN BADC Out. Outline of BADC's programmes under second five year plan (1980-85). | BAN BADC Phy. Physical verification of fertilizer. |
Includes bibliographical references.