000 cam a22 a 4500
999 _c48267
_d48267
003 BD-DhIDS
005 20180628194951.0
008 180628s2013 bg ||||| |||| 00| 0 eng d
040 _aBD-DhIDS
_cBD-DhIDS
_dBD-DhIDS
086 _aBAN MP IMED IMP-36
110 2 _aMinistry of Planning
_bImplementation Monitoring and Evaluation Division
245 0 0 _aimpact evaluaiton study of system loss reduction of Titas Gas Transmission and Distribution Company Limited (TGTDCL).
260 _aDhaka :
_bImplementation Monitoring and Evaluation Division (IMED) ,
_c2013
300 _axii, 67p. :
_bill. ;
_c30 cm.
504 _aIncludes bibliographical references.
610 0 4 _aTitas Gas Transmission and Distribution Company Limited
_xSystem loss reduction
942 _2ddc
_cDC