000 | cam a22 a 4500 | ||
---|---|---|---|
999 |
_c43704 _d43704 |
||
003 | BD-DhIDS | ||
005 | 20180420193723.0 | ||
008 | 180420s1963 pk ||||| |||| 00| 0 eng d | ||
040 |
_aBD-DhIDS _cBD-DhIDS _dBD-DhIDS |
||
041 | _aEng | ||
086 | _aBAN BEP Eco | ||
110 | 2 | _aBerger Engineers-Pakistan | |
245 | 0 | 0 | _aEconomic and engineering feasibility report to Government of East Pakistan on Mymensingh-Jamalpur Bahadurabad Ghat road. |
260 |
_aDhaka : _bBerger Engineers-Pakistan (BEP) , _c1963 |
||
300 |
_a227p. : _bill. ; _c30 cm. |
||
504 | _aIncludes bibliographical references. | ||
650 | 0 | 4 |
_aFeasibility studies _zBangladesh |
650 | 0 | 4 | _aEconomic conditions |
650 | 0 | 4 | _aEconmic analysis |
650 | 0 | 4 | _aEngineering |
942 |
_2ddc _cBK |