000 | cam a22 a 4500 | ||
---|---|---|---|
999 |
_c19057 _d19057 |
||
003 | BD-DhIDS | ||
005 | 20180425003551.0 | ||
008 | 180425s1993 bg ||||| |||| 00| 0 eng d | ||
040 |
_aBD-DhIDS _cBD-DhIDS _dBD-DhIDS |
||
041 | _aEng | ||
086 | _aBAN MIWDFC FAP-3.1 annex-7 | ||
110 | 2 |
_a _aBangladesh. Ministry of Irrigation, Water Development and Flood Control |
|
245 | 0 | 0 |
_aJamalpur prority project study, FAP-3.1 : _bFinal feasibility report; annex-7, engineering / |
260 |
_aDhaka : _bMIWDFC , _c1993 |
||
300 |
_av.p. : _bill. ; _c28cm. |
||
504 | _aIncluding indexes. | ||
650 | 0 | 4 | _aFlood Action Plan |
650 | 0 | 4 | _aBangladesh |
650 | 0 | 4 | _aEngineering |
650 | 0 | 4 | _aEmbankments |
650 | 0 | 4 | _aFlood control |
650 | 0 | 4 | _aFloods |
942 |
_2ddc _cDC |