000 | cam a22 a 4500 | ||
---|---|---|---|
999 |
_c19056 _d19056 |
||
003 | BD-DhIDS | ||
005 | 20180425015918.0 | ||
008 | 180425s1992 bg ||||| |||| 00| 0 eng d | ||
040 |
_aBD-DhIDS _cBD-DhIDS _dBD-DhIDS |
||
041 | _aEng | ||
086 | _aBAN MIWDFC FAP-3.1 annex-7 | ||
110 | 2 | _aBangladesh. Ministry of Irrigation, Water Development and Flood Control | |
245 | 0 | 0 |
_aJamalpur priority project study, FAP-3.1 : _bdraft final feasibility report; annex-7, engineering. |
260 |
_aDhaka : _bMIWDFC , _c1992 |
||
300 |
_avarious pages : _bill. ; _c34 cm. |
||
504 | _aIncludes bibliographical references and index. | ||
650 | 0 | 4 | _aFloods |
650 | 0 | 4 | _aFlood Action Plan |
650 | 0 | 4 | _aFlood control |
942 |
_2ddc _cDC |